INLET FOGGING FOR A 655 MW COMBINED CYCLE POWER PLANT- DESIGN, IMPLEMENTATION AND OPERATING EXPERIENCE

机译:655 MW联合循环电厂的进气雾化-设计,实施和运行经验

获取原文
获取原文并翻译 | 示例

摘要

The design, installation, commissioning and operation of a fogging system for a large 655 MW combined cycle power plant is described. Technical details and practical installation issues are discussed. Special considerations as to how the fogging system could help in the augmentation of power during high temperature and low frequency operation of the gas turbine is discussed. Finally a discussion is made regarding the importance of inlet filtration and the proper selection of blade coatings.
机译:描述了用于大型655 MW联合循环电厂的雾化系统的设计,安装,调试和操作。讨论了技术细节和实际安装问题。讨论了关于雾化系统如何在燃气轮机的高温和低频运行过程中帮助增加功率的特殊考虑。最后讨论了入口过滤的重要性和叶片涂层的正确选择。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号