首页> 外文会议>International Conference on Water and Environment >Environmental Sustainability In Large Dam Projects: A Case Study Of Indira Sagar Project (1000 MW) On River Narmada, M.P., India
【24h】

Environmental Sustainability In Large Dam Projects: A Case Study Of Indira Sagar Project (1000 MW) On River Narmada, M.P., India

机译:大坝项目中的环境可持续性:印度M.P.,印度河上的Indira Sagar项目(1000 MW)的案例研究

获取原文

摘要

India is endowed with tremendous water wealth which is yet to be harnessed to its potential. Reasons for slow pace of development of water resources projects vary from lack of financial resources to deterrents sometimes posed by Environmentalists. Sustainable Development of any project is however received with great enthusiasm by the society. The models of sustainability are also designed to meet both economic and environmental objectives in time and space. Exploitation of natural resources beyond their regenerative capacities has led to environmental degradation worldwide. Sustainable Development therefore aims at maintaining an equilibrium between human needs and economic developments within the parameters of environmental conservation while ensuring trade-offs between desired production-consumption levels. Indira Sagar Project is an ambitious project on river Narmada. It has an installed capacity of 1000 MW and is located at Punasa in the district of Khandwa, Madhya Pradesh. The Project is the biggest in India on its completion in terms of its storage capacity. Due to its tremendous water holding capacity it will provide water to all the downstream projects i.e. Omkareshwar Project and Maheshwar Project in Madhya Pradesh and Sardar Sarovar Project in Gujarat. The Indira Sagar Project was granted Environment & Forest clearance in the year 1987 by Ministry of Environment and Forest, New Delhi. Big storage schemes on one hand take care of vagaries of monsoon and on the other, also entail environmental consequences. In the present paper case study of Indira Sagar project has been discussed with special reference to efforts made in Prediction, Management and Mitigation of Environmental and Social consequences.
机译:印度是赋予巨大的水财富,尚未被利用它的潜力。水资源项目缓慢发展速度的原因因缺乏缺乏环境主义者而威慑的财政资源而异。然而,任何项目的可持续发展都以极大的热情受到了极大的热情。可持续发展的型号也旨在满足经济和环境目标及空间。超出其再生能力的自然资源开采导致全世界环境退化。因此,可持续发展旨在维持环境保护参数的人类需求和经济发展之间的均衡,同时确保所需生产 - 消费水平之间的权衡。 Indira Sagar项目是Narmada河上的一个雄心勃勃的项目。它的装机容量为1000兆瓦,位于Madhya Pradesh的Khandwa区旁路。该项目是在印度最大的储存能力完成。由于其巨大的水持有能力,它将为所有下游项目提供水,即奥卡勒人员和古吉拉特邦的Madhya Pradesh和Sardar Sarovar项目中的Maheshwar项目。新德里环境与森林部,Indira Sagar项目在1987年被授予了1987年的环境和森林清关。一方面的大存储方案照顾季风的变幻莫测,还有环境后果。在本文中,对Indira Sagar项目的研究已经讨论了对环境和社会后果的预测,管理和缓解所作的努力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号