首页> 外文会议>日本機械学会年次大会 >Lead-Bismuth Cooled Fast Reactor Conceptual Design in Feasibility Study
【24h】

Lead-Bismuth Cooled Fast Reactor Conceptual Design in Feasibility Study

机译:铅铋冷却的快速反应堆可行性研究中的概念设计

获取原文

摘要

A comparative design study is performed on Pb-Bi cooled reactors with forced and natural convection (FC and NC) cooling. Eliminating an intermediate cooling system makes the heat transport system simple and can decrease the amount of the weight of NSSS. The Lead-Bismuth cooled reactor concepts may attain construction cost goal (¥200,000/kWe). And, the nitride fuel makes breeding ratio of 1.2 with 150GWd/t of burnup. The results of unprotected event analyses such as UTOP and ULOF show that both of concepts have possible features to withstand unprotected events due to negative reactivity feedback by Doppler effect, control rod drive line expansion, etc.. These results lead to a conclusion that both of concepts have possible capability as one of future promising core concepts.
机译:对具有强制和自然对流(Fc和NC)冷却的PB-BI冷却反应器进行比较设计研究。消除中间冷却系统使热传输系统简单,可以降低NSSS的重量。铅铋冷却反应堆概念可以获得施工成本目标(¥200,000 / kWe)。并且,氮化物燃料使繁殖比为1.2,燃烧150gWd / t。 UTOP和ULOF等未受保护的事件分析结果表明,由于多普勒效应,控制杆驱动线扩展等负反应性反馈,概念都具有可承受未受保护的事件的特征。这些结果导致了这两个结果概念具有可能的能力作为未来有前途的核心概念之一。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号