Experience of Constructing the Resettlement Village Facilities for the 280MW Geothermal Power Project at Olkaria, Kenya

机译:在肯尼亚奥尔卡里亚280MW地热电工程建设安置村设施的经验

获取原文

摘要

The 280MW KenGeb Olkaria Geothermal power project consists of two similar power plants namely Olkaria I Extension and Olkaria IV. They are located about ten kilometers apart. Each power plant includes connections of about twenty five high temperature geothermal steam wells covering an area of about ten square kilometers. The steam field development facilities include roads, steam and brine pipelines, separator stations, underground power supply and control cables and other system networks. Hazards in the steam field include, hot pipelines (up to 160°C), open ponds, hydrogen sulphide gas, loud noise during well testing or plant malfunction, and dust during construction.
机译:280MW KengeB Olkaria地热电项目包括两个类似的电厂,即奥尔卡里亚I延伸和奥尔施亚IV。它们分开大约10公里。每个电厂包括约二十五个高温地热蒸汽井的连接,覆盖约10平方公里的面积。蒸汽田开发设施包括道路,蒸汽和盐水管道,分离站,地下电源和控制电缆等系统网络。蒸汽场中的危险包括,热水管(高达160°C),开放池,硫化氢气体,良好测试过程中的致噪声,施工期间的灰尘。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号