Methodologic criteria to modify existing dam stilling basins, to make them suitable for discharges bigger than original design flow

机译:修改现有大坝静脉盆地的方法标准,使它们适用于比原始设计流程更大的放电

获取原文

摘要

In order that ancient dams comply with the new security requirements demanded by the regulations in force, it is necessary to check them and to lay down general methodologic criteria. Based on this, the changes needed by these dams can be assessed and done so they function correctly with spillway flows bigger than original design flows. This paper is related to the stilling basins placed at the toe of gravity dam spillways where energy is dissipated by means of hydraulic jump. Some theoretical ideas are presented and they allow to plan the changes that have to be done to the stilling basin so it works correctly under the new flow conditions. These are: a predimensioning chart that makes easier the choice of the kind of stilling basin valid for a particular project according to the specific flow and the water level height upstream the spillway (crest elevation plus design head), and artificial aeration in the chute, inmediatly upstream of the dissipation structure, as a way to avoid cavitation and improve the hydraulic conditions at its entrance. Two examples are solved to clarify the ideas and reasonings presented.
机译:为了使古老的大坝符合强制规定要求的新安全要求,有必要检查它们并奠定一般的方法标准。基于这一点,可以评估和完成这些大坝所需的变化,因此它们用比原始设计流程大的溢洪道流正常运行。本文与放置在重力坝溢洪道脚趾的静脉盆地有关,其中能量通过液压跳跃而消散。提出了一些理论想法,他们允许计划必须在静脉盆地完成的变化,以便在新的流动条件下正确工作。这些是:一种预测图,使得根据特定流量和水位高度在溢洪道(Crest Expation Plus Design Head)上游的水位高度和水位高度以及滑槽中的人工通气,可以更容易地选择对特定项目有效的种类盆地的选择。在耗散结构的上游,作为避免空化和改善其入口的液压条件的方法。解决了两个例子,以澄清所提出的思想和推理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号