首页> 外文会议>IEEE Power Engineering Society General Meeting >Presentation: The Southern African Power Pool History, Formation and Future Challenges
【24h】

Presentation: The Southern African Power Pool History, Formation and Future Challenges

机译:介绍:南部非洲权力池历史,形成和未来挑战

获取原文

摘要

Historically electricity trading in Southern Africa started in the early 1960 as bilateral trade after the commissioning of the Kariba Hydro Power Station situated on the border between Zambia and Zimbabwe. The great hydro potential of the Zambezi River gave rise to the commissioning of more plants. This saw the extension and more bilateral electricity trading arrangements being put in place. The Southern African Power Pool (SAPP) was created in April 1995 through the SADC treaty to optimise the use of available energy resources in the region and support one another during emergencies. At the time of creation, the SADC governments agreed to allow their national power utilities to enter into the necessary agreements that regulate the establishment and operation of the SAPP. The past, the present and the future of SAPP would be addressed in this paper. SAPP is transforming from a cooperative into a competitive pool.
机译:历史上,南部非洲的电力交易于1960年代初开始作为双边贸易,后位于赞比亚和津巴布韦边境的卡里巴水电站后。赞比西河的巨大水电潜力引发了更多植物的调试。这看到延伸和更多的双边电交易安排到位。南部非洲电力池(SAPP)于1995年4月创建,通过SADC条约,优化该地区的可用能源资源,并在紧急情况下互相支持。在创造时,南部南部政府同意允许其国家电力公用事业公司进入规范建立和运作的必要协议。在本文中将解决过去,现在和SAPP的未来。 SAPP正在从合作社转换为竞争池。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号