首页> 外文会议>Metallurgical Plant Conference >When Does Further Processing at the Mine Site Make Sense?
【24h】

When Does Further Processing at the Mine Site Make Sense?

机译:什么时候在矿场进一步处理才有意义?

获取原文

摘要

A century ago, new mines were often accompanied by smelters. In Australia, smelters were built at the Daydream mine near Broken Hill, at Kuridala and Mount Elliott near Mount Isa, Broken Hill, Mount Lyell, Mount Morgan, Mount Isa, and more recently at Tennant Creek, Kalgoorlie and Olympic Dam. Now the big miners eschew site-based processing in favour of shipping concentrate to smelters in Europe and Asia. As Chip Goodyear was in the process of vacating his leadership role at BHP Billiton, he was quoted as saying that BHP should concentrate on mining ore and leave 'to others the skill set of processing that material'. Yet there are times when on-site processing clearly makes sense. Few companies ship gold ore or concentrate to China for gold extraction. New smelters are being built in Zambia. Solvent-extraction and electrowinning plants frequently produce copper from oxide ores and concentrates while pressure leaching is increasingly being considered for copper sulfide ores. Some argue that on-site processing is best because the waste products can be returned to the ground from whence they came, avoiding potentially large disposal costs in more-populated areas. Copper treatment and refining charges will not remain at 45 dollars per tonne and 4.5 cents per pound forever. This paper examines when it makes sense to use on-site pyro- or hydrometallurgical processes in today's environment and comments on how current trends might alter the balance in future.
机译:一个世纪前,新的矿山常常伴随着冶炼厂。在澳大利亚,冶炼厂在破碎的山上建造了Daydream Mine,在Kuridala和Mount Elliott附近的Mount Isa,Mount Mount Lyell,Mount Morgan,Mount Isa Mount,最近在Tennant Creek,Kalgoorlie和Olympic Dam。现在,大型矿工避开了基于网站的处理,支持欧洲和亚洲冶炼厂的运输。由于芯片姓名在BHP Billiton腾出了他的领导作用,他被引用说,BHP应该专注于采矿矿石,并将其他人留给其他人的处理。然而,有时候在现场处理清楚地有意义。很少有公司将黄金矿石运送给中国的黄金提取。新冶炼厂正在赞比亚建造。溶剂 - 萃取和电陶油宁植物经常从氧化物矿石中产生铜并浓缩,而硫化铜矿石越来越多地考虑压力浸出。有些人认为现场加工是最好的,因为废物产品可以从他们来到的何处返回地面,避免在更多人口稠密地区的潜在大量的处置成本。铜治疗和炼油收费将不会以每吨45美元,每磅4.5美分。本文审查了在当今环境中使用现场的热塑性或湿法冶金过程以及对当前趋势在将来可能改变平衡的评论有意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号