首页> 外文会议>International Mine Water Association Symposium >Open cast mines as river sediment and pollutant sinks. The example Mulde Reservoir (East Germany)
【24h】

Open cast mines as river sediment and pollutant sinks. The example Mulde Reservoir (East Germany)

机译:开放铸造矿山作为河沉积物和污染物水槽。示例Mulde水库(东德国)

获取原文

摘要

Since 1975, the Mulde River has flown through the abandoned open-cast lignite mining pits at Muldenstein near Bitterfeld (Germany) forming a lake named Mulde Reservoir. Ever since, the Mulde Reservoir has built up a sediment and pollutant deposit protecting the downstream water bodies and sediment quality in the lower Elbe stretch extending to the port of Hamburg area and the North Sea. Therefore, the Mulde Reservoir is an example for beneficial effects of riverine flow-through of pit lakes.Core drillings have revealed that the sediments currently deposited in the Mulde Reservoir still have to be regarded as highly polluted as to their contents of As, Cd, Cr, Hg, Ni, Pb, Zn, according to the classification of the Pollutant Sediment Management Concept (PSMC) of Elbe River. Arsenic and the mentioned metals originate from former metal mining and processing in the upper part of the catchment of the Mulde River. However, a decrease in pollutant inflow since 1990 has been documented, correlating with the long-term changes observed in the upper course of the Mulde River. As far as organic pollutants are concerned, the lake sediments do not show any excessive concentrations, apart from a few exceptions.From a geochemical and hydraulic point of view, there is presently no need to remove the contaminated sediments from the Mulde Reservoir. Main activities in sediment management should focus on further improving stabilization and efficiency of the Mulde Reservoir sedimentation zone and its transregionally vital ecosystem services. Given the present retention capacity of the Mulde Reservoir, it will continue to serve as an important sediment trap of supra-regional significance for the downstream water courses for at least another 770 years.
机译:自1975年以来,Mulde River在Bitterfeld(德国)附近的Muldenstein附近的被遗弃的开放式伐木特采矿坑飞行,形成了一个名叫Mulde水库的湖泊。自从以来,Mulde水库已经建立了沉积物和污染物沉积物,保护下游水体和沉积物质量延伸到汉堡地区和北海的港口。因此,Mulde水库是河流湖流流动的有益效果的一个例子。钻井钻孔透露,目前存放在Mulde水库中的沉积物仍然必须被视为兼容CD的内容, CR,HG,NI,PB,ZN,根据易北河污染物沉积物管理概念(PSMC)的分类。砷和上述金属源自麦德尔德河集水集中的前金属采矿和加工。然而,自1990年以来的污染物流入减少了记录,与Mulde河的上部过程中观察到的长期变化相关。就有机污染物而言,除了几种例外,湖泊沉积物并未显示出任何过度浓度。通过地球化学和水力的观点,目前无需去除来自Mulde水库的受污染的沉积物。沉积物管理中的主要活动应专注于进一步提高Mulde水库沉降区的稳定和效率及其转基因重要生态系统服务。鉴于Mulde水库目前的保留能力,它将继续作为至少又为70岁的下游水道课程的重要沉积物陷阱。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号