首页> 外文会议>International Mine Water Association Symposium >STORMWATER MANAGEMENT AND THE LIMITED DISCHARGE SYSTEM OF THE BATU HIJAU MINE
【24h】

STORMWATER MANAGEMENT AND THE LIMITED DISCHARGE SYSTEM OF THE BATU HIJAU MINE

机译:雨水管理与巴图茅庐的有限放电系统

获取原文

摘要

Managing stormwater runoff and limiting its discharge at the Batu Hijau mine is critical to the success of this copper/gold mining project. As is common in tropical environments, the area experiences frequent high intensity rainfall events, resulting in significant erosion and sedimentation challenges associated with the overburden stockpiles that will ultimately store 2 billion tonnes of potentially acid generating soil and rock. The stormwater management plan developed for the mine included construction of numerous diversion channels constructed through steep terrain, massive sediment control features that provide 9 million cubic meters of storage, and a 3,600 liter per second, high-head pumping system. The result is a limited discharge facility for the entire mine area. The cost of managing stormwater and sediment control is 150 million dollars.
机译:管理雨水径流和限制其在Batu Hijau Mine的卸货对该铜/金矿项目的成功至关重要。在热带环境中常见,该地区经历了频繁的高强度降雨事件,导致与过度覆盖物库存相关的显着侵蚀和沉降挑战,最终将储存20亿吨潜在的酸性土壤和岩石。为该矿井开发的雨水管理计划包括通过陡峭地形,大规模沉积物控制功能构建的众多转移渠道的建设,提供900万立方米的储存,以及每秒3,600升的高头泵送系统。结果是整个矿区的有限放电设施。管理雨水和沉积物控制的成本为1.5亿美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号