Evaluation of ditch plug designs and construction methods for the blocking of field ditches to restore wetland hydrology in the coastal plains of South Carolina

机译:沟渠设计和施工方法的评价挡住南卡罗来纳沿海平原恢复湿地水文的田野沟渠

获取原文

摘要

Approximately seventy-five ditch plugs were installed in the coastal plains of South Carolina to restore wetland hydrology to sites under the federal Wetland Reserve Program (WRP) from 1997 to 2000. Some problems were encountered with the early ditch plugs and the designs and construction methods were modified over time. A visual inspection and evaluation of selected ditch plugs was completed in the spring of 2001 and recommendations are made as to the most successful ditch plug configuration. 1.)Borrow for the ditch plug should be upstream and not immediately adjacent to the plug. 2.) "Wing dikes" should be part of the design. 3.) Placing rock riprap on the downstream end of the plug should be considered to provide any overflow water access backinto the channel without causing erosion. 4.) A ditch plug can be allowed to naturalize with native vegetation and does not require the maintenance that a dike across the ditch would require. 5.) When a steady flow of water is expected over the plug, aplug constructed of crusher-run gravel and riprap works well.
机译:在1997年至2000年,南卡罗来纳州沿海平原安装了大约七十五个沟头插头,以恢复湿地水文到联邦湿地储备计划(WRP)下的地点。早期沟渠和设计和施工方法遇到了一些问题随着时间的推移被修改。在2001年春季完成所选沟头插头的视觉检查和评估,并提出了最成功的沟局配置。 1.)为沟头借用,应上游,而不是立即与插头相邻。 2.)“Wing Dikes”应该是设计的一部分。 3.)放置在插头的下游端上的岩石撕裂应被认为是提供任何溢流水访问反向通道而不会导致侵蚀。 4.)可以允许沟头插头与本地植被一起归化,并且不需要维护沟渠的堤防需要。 5.)当塞子上预期稳定的水流量,Aplug由破碎机运行的砾石和撕裂工作很好。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号