首页> 外文会议>NATO Advanced Research Workshop on Source Control Measures for Stormwater Runoff >The use of continuous long term simulations for the design and impact assessment of source control measures
【24h】

The use of continuous long term simulations for the design and impact assessment of source control measures

机译:使用连续的长期模拟来实现源控制措施的设计和影响评估

获取原文

摘要

Since the new Flemish guidelines for urban drainage were introduced in 1996 [1], more emphasis has been put on source control measures in order to reduce the peak runoff from urban areas during wet weather conditions. The keyword is 'disconnecting' impervious areas from the combined sewer system. This involves the construction of upstream storage and infiltration facilities, rain-water tanks for reuse in households and the revaluation of ditches [2,3]. However, one must realise that the runoff discharges from the 'disconnected' areas still have to be taken into account, because during heavy rainfall periods not all rain-water can be stored locally. Therefore, urban runoff plans with respect to extreme events and flooding risks are very important.
机译:自1996年引入新佛兰芒语法以来[1]以来,更加重视来源控制措施,以减少潮湿天气条件下城市地区的峰值径流。关键字是从组合的下水道系统断开不透过的区域。这涉及建造上游储存和渗透设施,雨水箱,用于家庭的重用和沟渠的重估[2,3]。然而,必须认识到,从“断开连接”区域的径流排放仍然必须考虑,因为在大雨期间,并非所有雨水都可以在本地存储。因此,城市径流计划关于极端事件和洪水风险非常重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号