【24h】

DEVELOPMENT OF A RISK BASED POLICY FOR CONTAMINATED SITES OF THE WALLOON REGION, BELGIUM

机译:建立基于风险的瓦隆地区污染地点政策,比利时

获取原文

摘要

Past industrial and economical activities accomplished on the territory of the Walloon Region (16.844 km~2, South of Belgium) have left over some 2,044 abandoned and (potentially) contaminated sites, covering a total area of 9,000 hectares. While the need to rehabilitate these sites - in view of enabling them to support new economical activities - has been identified, as early as in the late 1980's, improvements up to now are still globally insufficient. Appropriate tools for early decision making relying upon risk acceptance and in helping making objective choices, i.e. setting priorities in studies and required remedial actions, are lacking. This has been recently recognized as a crucial constraint, and has led to initiate the development of a specific risk based policy for contaminated soils and sites. Ongoing work has been split into three pools working in a concerted and integrated way, devoted to the setting up of a strategic plan, a technical- and a juridical frame of the future policy, respectively. In a general way, risk assessment is advanced as a key concept to define the investigation procedures and to help administrative decision makers. A general frame (figure 1) has been proposed for site management, corresponding to a - now widespread- 3 step procedure including a "pre-diagnosis" study, a preliminary soil investigation, and an in-depth investigation, respectively. Each of the three steps includes a specific risk sounded interpretation phase, leading to an administrative decision (either soil investigation necessity, preliminary risk acceptance, or risk acceptance/clean-up, respectively). Two specific tools have been developed in order to help the administration to decide on the site status and/or on the future actions needed: 1) A specific tool has been developed for decision makers to establish remedial- and investigation priorities. The inputs are the data collected in steps 1 and/or 2. The particular features of this ranking system are presented in point 2. 2) Within the framework of preliminary investigations, (step 2) a methodology for early decision making based on risk acceptance of contamination data, is currently under development. It constitutes an alternative between a typical normative approach (as used in the Flemish Region, North of Belgium) and a typical "site specific risk evaluation" approach (as used in France). The important features of the procedure are highlighted in point 3.
机译:在瓦隆地区境内完成的过去工业和经济活动(比利时南部16.844公里〜2)留下了超过2,044个被遗弃的和(可能)污染的地点,占地面积为9,000公顷。虽然需要康复这些网站 - 鉴于使他们能够支持新的经济活动 - 已经确定,早在1980年代后期,现在的改进仍然是全球不足。适当的提前决策工具依靠风险接受以及帮助客观选择,即确定研究中的优先事项和所需的补救措施。这已被认为是至关重要的制约,并导致开发基于污染的土壤和地点的特定风险政策的发展。正在进行的工作已被分为三个汇集,以协调一致的方式工作,分别致力于建立战略计划,技术 - 和未来政策的法律框架。以一般的方式,风险评估是先进的作为界定调查程序和帮助行政决策者的关键概念。已经提出了一般帧(图1)用于现场管理,对应于A - 现在的广泛的3步骤,包括“预诊断前”研究,初步土壤调查和深入调查。这三个步骤中的每一个都包括特定的风险响应的解释阶段,导致行政决定(分别土壤调查必要性,初步风险接受或风险接受/清理)。已经制定了两种特定的工具,以帮助管理局决定现场状态和/或未来所需的行动:1)已经为决策者制定了特定工具,以确定补救和调查优先事项。输入是在步骤1和/或2中收集的数据。在初步调查框架内,该排名系统的特定特征在第2页中呈现。(步骤2)基于风险接受的早期决策方法污染数据目前正在开发。它构成了典型的规范方法(如在比利时弗拉​​什地区)和典型的“网站特异性风险评估”方法(在法国使用)之间的替代方案。该过程的重要特征在第3点突出显示。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号