首页> 外文会议>North American Steel Construction Conference >Bridge Inspection without Traffic Disruptions - Installation of a Motorized Bridge Inspection Traveler Platform beneath the Burlington-Bristol Bridge
【24h】

Bridge Inspection without Traffic Disruptions - Installation of a Motorized Bridge Inspection Traveler Platform beneath the Burlington-Bristol Bridge

机译:没有交通中断的桥式检查 - 在伯灵顿 - 布里斯托尔桥下的电动桥检查旅行平台安装

获取原文

摘要

In today's economic climate - of making every infrastructure dollar count - it is critically important to properly inspect and maintain our older long span bridges. Routine bridge inspections and maintenance not only provide the user with a safer structure, but also provides the owner with a bridge that will stand the test of time. Bridge inspection/maintenance procedures, however, can be costly to the owner and a major inconvenience to the user when access to the underside of the structure can only be achieved from inspection vehicles parked on the bridge deck. Travel lane closures to complete the required work can cause significant safety and traffic problems, especially on narrow bridges. To address these concerns, the Burlington County Bridge Commission made the decision to install a motorized rolling traveler platform beneath its Burlington-Bristol Bridge. The Burlington-Bristol Bridge is a long span moveable toll structure that crosses the Delaware River, connecting southeastern Pennsylvania with New Jersey. The bridge carries two 10' travel lanes and a 4' sidewalk, thus requiring a night time bridge closure when inspection or construction access vehicles, such as snoopers, are required. The traveler system was installed on the Burlington-Bristol Bridge during the summer of 2009. When suspended from the underside of the bridge, the traveler platform will be guided by motorized carriages that will travel along steel track beams. The total travel range of the platform is 940' and includes access to the 540' moveable vertical lift main span and the two adjacent 200' tower spans. When needed, the traveler platform will be lifted in place from a small boat along the river, eliminating traffic disruptions on the bridge, and used for bridge inspection, maintenance and repairs. It will only occupy the underside of the bridge when being used; once work is complete it will be removed. The traveler platform will greatly benefit the owner as well as the user by providing a more economical, safer and non-disruptive underside inspection and repair alternative when compared to past procedures that required travel lane closures.
机译:在今天的经济气氛中 - 使每一美元计数的每一项基础设施 - 妥善检查和维护我们的旧长跨度桥梁是至关重要的。常规桥接检查和维护不仅为用户提供更安全的结构,而且还为所有者提供了一个桥梁的桥梁,该桥将经受时间考验。然而,桥梁检查/维护程序可能对所有者来说昂贵,并且只有在访问结构下面时,只能从停放在桥甲板上的检查车辆中实现了用户的主要不便。旅行车道关闭完成所需的工作会导致显着的安全和交通问题,特别是在狭窄的桥上。为了解决这些问题,伯灵顿县桥委员会决定在伯灵顿 - 布里斯托尔桥下安装机动滚动旅行平台。 Burlington-Bristol桥是一种长期可移动的收费结构,穿过特拉华河,与新泽西州连接宾夕法尼亚州东南部。该桥携带两个10'行程车道和4英尺的人行道,因此需要夜间桥接器需要在检查或施工装置,例如窥探符。在2009年夏季,旅行者系统安装在伯灵顿 - 布里斯托尔桥上。当悬挂在桥梁的下面时,旅行平台将由电动车厢引导,将沿着钢轨梁行进。平台的总行驶范围为940',包括访问540'可移动垂直提升主跨度和两个相邻的200塔塔跨度。在需要时,旅行者平台将从沿河的小船抬起,消除桥上的交通中断,并用于桥梁检查,维护和维修。它只会在使用时占据桥的底部;一旦完成工作,它将被删除。与过去的程序相比,旅行者平台将极大地使所有者以及用户提供更经济,更安全和无中断的底面检验和修复替代方案。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号