首页> 外文会议>International Conference on Electric Utility Deregulation and Restructuring and Power Technologies >SCE's deregulation 'direct access implementation project' the 'California experiences' (with emphasis on the usage reporting and settlement processes)
【24h】

SCE's deregulation 'direct access implementation project' the 'California experiences' (with emphasis on the usage reporting and settlement processes)

机译:SCE的放松管制“直接访问实施项目”“加利福尼亚经验”(重点是使用报告和结算流程)

获取原文

摘要

Restructuring of the California electric industry, known in California as direct access (DA), would create a process by which customers could chose another provider of electric energy. The design of direct access was going thorough a tortuous and slow series of proposals, hearings, and decisions by the California Public Utilities Commission(CPUC). However, the slowness of the process frustrated all players-the utilities, the state legislature, and those wishing to enter the huge California market for electric energy. Eventually the utilities began working with the California legislature to enact a statute that would take control of the process. The utilities were anxious to ensure that the process would be orderly, and that some of their desired features could be preserved-and most significantly, the opportunity to recover most of their stranded costs.
机译:加州电力工业的重组加州作为直接访问(DA),将创建一个客户,客户可以选择其他提供者的电能。直接访问的设计彻底是加州公共公用事业委员会(CPUC)的曲折和慢速宣传的提案,听证会和决策。然而,这一过程的缓慢挫败了所有球员 - 公用事业,国家立法机构以及希望进入巨大加利福尼亚电能市场的公司。最终,公用事业公司开始与加利福尼亚立法机构合作,以制定一项法规,该法令将控制该过程。公用事业公司急于确保该过程是有序的,并且他们的一些所需特征可以保存 - 最重要的是,有机会恢复其搁浅成本的机会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号