首页> 外文会议>North American tuneling : conference and exhibition >Intake tunnel construction at Lake Mead
【24h】

Intake tunnel construction at Lake Mead

机译:米德湖的进气隧道施工

获取原文

摘要

Saddle Island on the west shore of Lake Mead is the site of two water intakes for the Southern Nevada Water Authority system serving the Las Vegas valley. The first system was completed in 1970 and the second will be completed in 2002. Both tunnels were driven by the drill-and-blast method in fractured and faulted metamorphic rock. Grouting ahead of the tunnel face was essential in the construction of both tunnels. Hydrostatic pressures were about 40 m in the first tunnel and 100 m in the second tunnel. This paper summarizes the tunnel excavation and water-control grouting in both tunnels.
机译:米德湖西岸的马鞍岛是南部内华达州南部的两种水摄入量的遗址,供应拉斯维加斯山谷。第一个系统于1970年完成,第二个系统于2002年完成。两条隧道都是由骨折和断层变质岩中的钻探和爆破方法驱动的。在隧道面前的灌浆在两个隧道的建造方面都是必不可少的。在第一隧道中的静压压力为约40μm,在第二隧道中的100μm。本文总结了两个隧道中的隧道挖掘和水控制灌浆。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号