首页> 外文会议>North American tuneling : conference and exhibition >Monitoring of TBM-induced ground vibrations
【24h】

Monitoring of TBM-induced ground vibrations

机译:监测TBM诱导的地面振动

获取原文

摘要

Hager GeoScience, Inc. (HGI) has been monitoring tunnel boring machine (TBM) vibrations associated with mining of the MetroWest Water Supply Tunnel, a 17.6-mile long, deep-rock, pressurized tunnel outside Boston, Massachusetts. The purpose of the monitoring is to detect TBM-induced vibrations and characterize their waveforms, to study the potential impacts on residences above and adjacent to the tunnel alignment. The monitoring is being conducted at the ground surface as the TBM passes underneath the sensors at depths between 200 and 450 feet. Monitoring is performed using commercially available seismographs and amplifiers. Data are analyzed using signal analysis software developed by HGI. TBM mining has been occurring simultaneously along three tunnel headings with variable geologic settings. HGI has monitored at locations along each heading.
机译:Hager Geoscience,Inc。(HGI)一直在监测与Metrowest供水隧道的开采相关的隧道镗床(TBM)振动,17.6英里长,深岩石,Boston,Massachusetts之外的深层加压隧道。该监测的目的是检测TBM诱导的振动并表征它们的波形,以研究上面的居住的潜在影响和邻近隧道对准。当TBM在传感器下方在200到450英尺之间的深度下,监测在地面进行监测。使用市售地震仪和放大器进行监测。使用HGI开发的信号分析软件进行分析数据。 TBM挖掘已沿三个隧道标题同时发生,具有可变地质设置。 HGI在每个标题的位置监测。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号