【24h】

VERIFYING THE CORE MODEL OF A BOILING WATER REACTOR SIMULATOR

机译:验证沸水反应器模拟器的核心模型

获取原文

摘要

The Perry Nuclear Power Plant has recently gone through an extensive upgrade to the site simulator. The new simulator is capable of modelling the core of the reactor in much more detail than the old simulator and is capable-of modelling cycle-specific core designs. A set of benchmarks has been performed to verify the applicability of the new core model. This paper discusses the verification process and reviews some of the physical characteristics that the core model of a nuclear power plant simulator mustbe able to reproduce.
机译:佩里核电站最近经过广泛升级到网站模拟器。新模拟器能够以比旧模拟器更详细地更详细地建模反应器的核心,并且能够建模特定的循环核心设计。已经执行了一组基准,以验证新核心模型的适用性。本文讨论了验证过程,并评论了核电站模拟器必须能够重现的核电厂模拟器的核心模型的一些物理特征。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号