Complete Coupled Fluid Flow and Stress Analysis for Xiluodu Hydro Project

机译:Xiluodu Hydro项目的完全耦合流体流量和应力分析

获取原文

摘要

Complex hydrogeological conditions exist in the dam site of Xiluodu power station. This paper describes the joint rock masses as equivalent continuum medium and establishes the complete coupled control equations of seepage and elasto-plastic deformation. The coupled analysis of the dam site shows: the seepage field at the site varies during the process of water impoundment of the reservoir, water pressure increases at the head of grottos and so does the seepage discharge on the wall of grottos. In the area of dam foundation, the seepage field calculated by the coupled method is obviously different from the one by the uncoupled method. Besides, the sliding resistance of rock joints decreases, which causes unfavorable effects on the dam safety.
机译:Xiluodu发电站的大坝现场存在复杂的水文地质条件。本文描述了关节岩体作为等效连续介质,并建立了渗流和弹塑性变形的完整耦合控制方程。坝址的耦合分析表明:现场的渗流场在储存器的水荷过程中变化,水槽的水压增加,漏洞在谷饰墙上也是如此。在坝基地区,通过耦合方法计算的渗流场显然与通过解耦方法的渗透场。此外,岩石接头的滑动阻力降低,这导致对大坝安全产生不利影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号