首页> 外文会议>Society of Petroleum Engineers/ICoTA coiled tubing roundtable >Utilizing 4 1/2. Monobores and rigless completions to develop marginal reserves
【24h】

Utilizing 4 1/2. Monobores and rigless completions to develop marginal reserves

机译:利用4 1/2。单声道和严格的完成,以发展边缘储备

获取原文

摘要

Marginal reserves in the Gulf of Mexico (GOM) shelf can be developed using old completion technology in new ways. Tubing-less completions or monobores are one of those technologies. Several monobores have been performed in the GOM, but usually, they wree not the primary completion technique. Most were performed out of necessity, either because liners were stuck above the zone of interest or drill pipe was stuck across the interval.
机译:墨西哥湾(GOM)货架中的边缘储备可以在新的方式中使用旧的完成技术开发。较少的完整性或单声道是其中一种技术。在GOM中已经在GOM中进行了几个单声道,但通常,它们不是主要完成技术。大多数是必要性的,因为衬垫被困在兴趣区或钻管上方的间隔内陷入困境。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号