首页> 外文会议>SPE/ICoTA coiled tubing roundtable >Utilizing 4 1/2. Monobores and rigless completions to develop marginal reserves
【24h】

Utilizing 4 1/2. Monobores and rigless completions to develop marginal reserves

机译:使用4 1/2。单孔和无钻完井以开发边际储量

获取原文

摘要

Marginal reserves in the Gulf of Mexico (GOM) shelf can be developed using old completion technology in new ways. Tubing-less completions or monobores are one of those technologies. Several monobores have been performed in the GOM, but usually, they wree not the primary completion technique. Most were performed out of necessity, either because liners were stuck above the zone of interest or drill pipe was stuck across the interval.
机译:墨西哥湾(GOM)陆架的边际储量可以使用旧的完井技术以新的方式进行开发。无管完井或单孔是这些技术之一。在GOM中已经执行了几个单孔,但是通常它们不是主要的完成技术。大多数操作都是由于不必要而进行的,这是因为衬管卡在了目标区域上方,或者钻杆卡在了整个间隔上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号