首页> 外文会议>International conference on dam safety and monitoring >Setup and performance of the dam movement montitoring system of daguangba hydropower project in nainan province of china
【24h】

Setup and performance of the dam movement montitoring system of daguangba hydropower project in nainan province of china

机译:中国奈南省大致坝水电工程坝运动监测系统的设置与性能

获取原文

摘要

This paper focuses on the deformation monitoring system setup and performance during construction of Daguangba Hydropower project lcoated in Hainan province of Chian, with details in the respects of deformation monitoring system setup, equipment installation and debugging, and monitoring operation during the construction period. The system quality is in line with the design requirement and national code. The initial analysis of the monitoring data indicates that the deformantion of concrete dam foundation and dam monolith is reasonable and that the project construction quality satisfies the design requuirement.
机译:本文重点介绍了在内南省海南省的DAGUANGBA水电项目建设中的变形监测系统设置和性能,详细介绍了变形监测系统设置,设备安装和调试和施工期间的监控操作。系统质量符合设计要求和国家代码。监测数据的初步分析表明混凝土坝基和坝体的变形性是合理的,项目建设质量满足了设计重新化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号