首页> 外文会议>International Joint Power Generation Conference and Exhibition >The success story at birchwood: operation below 0.10 LB/10{sup}6 BTU
【24h】

The success story at birchwood: operation below 0.10 LB/10{sup}6 BTU

机译:Birchwood的成功故事:操作低于0.10 LB / 10 {SUP} 6 BTU

获取原文

摘要

The Southern Energy, Inc. (SEI) Birchwood Power Facility is successfully operating on coal maintaining stack NO{sub}x emissions below 0.10 lb/10{sup}6 Btu (73 ppmvd at 3% O{sub}2, 43 ng/J) on a 30-day rolling average. The cogeneration plant uses an integrated approach for controlling NO{sub}x including in-furnace reduction from a TFS 2000 firing system and post-combustion control from selective catalytic reduction (SCR). The plant began operation in November 1996, and continues to meet the State of Virginia's stringent environmental requirements under all operating conditions. This paper focuses upon recent performance and operation of the NO{sub}x control technologies. Operational data of the NO{sub}x emissions from the steam generator as well as those exiting the SCR are presented. In addition, the latest information from the Spring '99 outage is discussed.
机译:南方能源公司(SEI)Birchwood Power设施在煤炭维持堆栈NO {Sub} X排放量下成功运行,低于0.10 LB / 10 {Sup} 6 Btu(73 ppmvd为3%o} 2,43 ng / j)在30天的滚动平均值。热电联产工厂使用综合方法来控制没有从TFS 2000射击系统和选择性催化还原(SCR)的炉内减少的炉内减少。该工厂于1996年11月开始运营,并继续满足弗吉尼亚严格的环境要求下的所有经营条件。本文重点介绍了近期{Sub} X控制技术的性能和操作。展示了从蒸汽发生器的NO {sub} x排放的操作数据以及退出SCR的那些。此外,讨论了Spring'99中断的最新信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号