Design overview of the state-of-the-art turbine replacement at limerick generating station

机译:Limerick发电站最先进的涡轮机更换的设计概述

获取原文

摘要

Siemens Power Corporation replaced the turbine steam paths at PECO Energy's nuclear power plant Limerick Generating Station Units 1 and 2. The need for replacement arose from stress corrosion cracking of the original low-pressure (LP) turbine rotor disks, which adversely affected the availability and reliability of the units. Through replacement with the state-of-the-art turbine components, efficiency improvements were achieved in addition to solving the reliability and maintenance issues of the original LP turbine rotors. The high-pressure turbine steam paths were replaced in order to achieve increased electrical output efficiency. The design features of the replacement turbine train will be discussed. In addition, the unique engineering activities performed to support this project will be commented on as well.
机译:西门子电力公司取代了PECO能源核电厂利易平发电站1和2的涡轮机蒸汽路径。需要替换的需求从原始低压(LP)涡轮机转子盘的应力腐蚀开裂产生,这对可用性产生不利影响单位的可靠性。通过更换最先进的涡轮机组件,除了解决原始LP涡轮机转子的可靠性和维护问题之外,还实现了效率的改进。更换高压涡轮蒸汽路径以实现增加的电输出效率。将讨论更换涡轮机列车的设计特征。此外,还将对此项目进行的独特工程活动进行评论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号