Consolidated, Multimedia Environmental Review and Licensing of Electric Generating Facility Projects in Maryland

机译:Maryland的综合,多媒体环境审查和电力发电机设施项目的许可

获取原文

摘要

To build a power plant or transmission line in the State of Maryland, a company must obtain a Certificate of Public Convenience and Necessity (CPCN) from the Maryland Public Service Commission (PSC). As part of this licensing process, applicants must address a full range of environmental, engineering, socioeconomic, planning, need, and cost issues. The CPCN constitutes permission to construct and operate the facility, and includes issuance of the required air quality, water appropriations, and tidal wetlands permits. The Maryland Power Plant Research Program (PPRP) serves as the lead agency for the consolidated review of CPCN projects. The consolidated review is the only process within the State regulatory framework that allows a comprehensive, multimedia review of power plants. The process allows the State to evaluate a range of potential environmental, socioeconomic, and cost impacts of new power plants, while balancing those considerations with the need to ensure adequate power supply. Because interested parties (regulatory, environmental, citizens) are involved at appropriate points, the consolidated review has allowed the State to manage potential conflict, and encourage voluntary resolution of disputes among parties prior to construction. Further, the consolidated review has been proven to provide a number of environmental and other benefits to the State that might not otherwise be realized with a more fragmented approach to power plant permitting. Typically, an applicant prepares a environmental review report for the CPCN application and PPRP coordinates the assessment of that information. For smaller generating units, PPRP frequently works directly with the applicants to develop the environmental review report. The collaborative environmental review approach implemented by PPRP in two recent cases resulted in a more streamlined licensing process. This paper will describe these two recent projects, provide background on power plant licensing in Maryland, and discuss how the collaborative approach led by PPRP proved to be environmentally beneficial.
机译:在马里兰州建造电厂或传输线,公司必须从马里兰州公共服务委员会(PSC)获得公共便利和必要性(CPCN)。作为此许可进程的一部分,申请人必须满足全方位的环境,工程,社会经济,规划,需求和成本问题。 CPCN构成构建和运营设施的许可,并包括发出所需的空气质量,水拨款和潮湿允许。马里兰州电厂研究计划(PPRP)是作为CPCN项目综合审查的主导机构。综合审查是国家监管框架内唯一的进程,允许全面的多媒体审查发电厂。该过程允许状态评估新电厂的一系列潜在的环境,社会经济和成本影响,同时平衡了这些考虑因素,需要确保充足的电源。由于有关各方(监管,环境,公民)涉及适当的积分,因此综合审查允许国家管理潜在冲突,并鼓励在建造之前自愿解决缔约方之间的争端。此外,已证明综合审查是为了为可能无法以更加零售的发电厂允许的方法实现的国家提供一些环境和其他福利。通常,申请人为CPCN申请的环境审查报告准备,PPRP协调该信息的评估。对于较小的生成单位,PPRP经常与申请人直接工作,以制定环境审查报告。 PPRP实施的协作环境审查方法在两个近期案件中实现了更精简的许可进程。本文将描述这两个最近的项目,提供了马里兰州电厂许可的背景,并讨论了PPRP领导的协作方法如何被证明是环境有益的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号