COST AND SCHEDULE ADVANTAGES FOR COMBUSTION TURBINE GENERATOR CONSTRUCTION USING THE DESIGN BUILD APPROACH

机译:使用设计构建方法燃烧汽轮机发生器施工的成本和安排优势

获取原文

摘要

There was a time not so long ago when most utilities had large engineering staffs, charged to overhead, that were kept busy designing new power plants. Utilities were in the growth phase of their life cycle and capacity additions consisted of greenfield conventional and nuclear power plants. This created a certain methodology for estimating costs, appropriating funds, accounting for the costs and contracting the construction of these projects. It also created an entire industry consisting of engineering firms, construction management firms, general contractors, contractors, subcontractors and suppliers to meet the project delivery needs of the utilities. Since in the formerly regulated Public Utility Industry capital investments were ultimately funded by rate increases, cost accountability was all-important. This resulted in little or no competition to drive down the costs of capacity additions. The competition introduced by deregulation has changed that picture significantly. Strategically managed companies are re-directing investment capital away from their mature power plants and toward new power plants that will better compliment their generation portfolio and provide the best long term return on their investment (ROI). The current market for peaking capacity has created an unprecedented demand for construction of simple cycle combustion turbine power plants. The majority of the newly created Merchant Power Industry capacity additions now consist of greenfield plants, which must be operational prior to the summer peak demand. The ideal location for these facilities is at an intersection of major natural gas and electric transmission lines. The attractiveness of these locations is the lower cost to interconnect with the gas and electric utilities and to minimize environmental impact through the interconnection to these facilities. Simple cycle combustion turbine plants can be brought to market faster than other technologies and typically have a shorter permit period.
机译:有一个时间不久前,当大多数公用事业公司都有大型工程人员,被指控开销,这一直忙于设计新的发电厂。公用事业在其生命周期的增长阶段,产能增加包括绿地传统和核电厂。这为估算成本,拨款资金,核算成本和承包这些项目的建设来创造了某种方法。它还创建了一个由工程公司,施工管理公司,一般承包商,承包商,分包商和供应商组成的整个行业,以满足公用事业的项目交付需求。由于在原期监管的公用事业行业资本投资最终按利率增加资金,成本问责制是全部重要的。这导致竞争越来越达到容量增加的成本。放松管制引入的竞争已显着改变了这幅画。战略管理公司正在重新指导投资资本远离其成熟的电厂和新的电厂,以更好地称赞他们的发电产品组合,并提供最佳的长期回报投资(ROI)。目前达到最佳能力的市场已经为简单循环燃烧汽轮机发电厂建造了前所未有的需求。大多数新创建的商业电力行业产能添加剂现在包括绿地工厂,必须在夏季峰值需求之前运行。这些设施的理想位置是主要的天然气和电动传输线。这些位置的吸引力是与天然气和电力公司互连的成本较低,并通过与这些设施的互连最小化环境影响。简单的周期燃烧涡轮机设备可以比其他技术更快地推向市场,并且通常具有更短的许可期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号