Ballylumford CCGT: Grid code fulfillment and test experience

机译:Ballylumford CCGT:网格代码履行和测试体验

获取原文

摘要

PPL, a subsidiary Company of BRITISH GAS, developed a project to build, own and operate a gas fired combined cycle power station in the 550-600 MW range at Ballylumford Power Station, Larne, Northern Ireland. The main constraints or requirements for the new plant were: in the event of a single turbine trip the max loss of plant load shall not exceed 200 MW/250 MW to meet NIE requirements, the required total spinning reserve should be at least 105 MW. Each generator is to be connected via a generator transformer and carried at either 110 kV or 275 kV to the respective switch house for tie-in to the NIE transmission system. One generator may supply the 110 kV system provided the max output does not exceed 130 MW with the balance supplying the 275 kV system. The power station will play a strategic role in Northern Ireland, replacing the existing plant, which delivered about 50% of the electric power consumed in the region. There are also plans to sell electricity generated in excess of consumption to the Republic of Ireland, so reducing the final cost to the consumer. The efficiency of the new combined cycle will far exceed that of the existing conventional steam cycle system which entered service in 1972, comprising 3 steam generators and three steam turbines delivering a total output of 600 MW. The new levels of efficiency have reduced power generation costs by roughly 50%, as well as reducing flue gas emissions significantly thanks to the plant design selected.
机译:PPL是一家英国天然气的子公司,制定了一个建造,拥有并在550-600 MW范围内进行的燃气燃烧的综合电力站,位于北爱尔兰的Larne,北爱尔兰的550-600 MW范围内。新工厂的主要限制或要求是:如果单涡轮机跳闸,厂载荷的最大损耗不得超过200 MW / 250 MW,以满足NIE要求,所需的总纺储量应至少为105兆瓦。每个发电机应通过发电机变压器连接,并以110kV或275kV携带到相应的开关房屋,以便连接到NIE传输系统。一个发电机可以提供110 kV系统,提供最大输出不超过130mW,其中平衡提供275 kV系统。该电站将在北爱尔兰发挥战略作用,取代现有植物,该植物占该地区消耗的电力约50%。还有计划在爱尔兰共和国产生超过消费的电力,因此降低了消费者的最终成本。新的组合循环的效率远远超过现有的传统蒸汽循环系统,该系统于1972年进入服务,包括3个蒸汽发生器和三个蒸汽涡轮机,输送了600 MW的总输出。新的效率水平降低了发电成本约为50%,并且由于所选的工厂设计,显着减少烟气排放。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号