首页> 外文会议>システム制御情報学会研究発表講演会 >A late binding mechanism of network variables between distributed controllers for supporting modularizing development of production facility
【24h】

A late binding mechanism of network variables between distributed controllers for supporting modularizing development of production facility

机译:分布式控制器与生产设施模块化发展的网络变量的后期绑定机制

获取原文

摘要

In recent years, many manufacturers are faced with realizations of rapid development of a new production system and shortening of a renewal period because of a change in demand structure, such as shortening of a product life cycle. As one of the trials that solve these subjects, we propose modularization of the production system and we developed the software logic controller which supports the modularized production system. The introduction of the network variable with a late-biding mechanism makes it easy to change the specification of the production system, and it helps the incremental development.
机译:近年来,许多制造商面临着快速发展的快速发展,新的生产系统和缩短更新时期,因为需求结构的变化,例如产品生命周期缩短。作为解决这些主题的试验之一,我们提出了生产系统的模块化,我们开发了支持模块化生产系统的软件逻辑控制器。通过延迟凸起机制引入网络变量使得易于改变生产系统的规格,有助于增量开发。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号