首页> 外文会议>IADC/SPE symposium on Asia Pacific drilling technology >Solving casing subsidence problems with downhole activated casing slip joints
【24h】

Solving casing subsidence problems with downhole activated casing slip joints

机译:用井下激活套管滑动接头解决套管沉降问题

获取原文

摘要

Subsidence in chalk fields loads casing and liners with axial compression loads and results in uneven radial loading of the pipe wall. Eventually the casing or liner will fail from plastic collapse under the stress generated by the uneven radial loading combined with axial compressive load. Casing Slip Joints placed in the compacting zones can reduce the combined stress in teh corss sections thus increasing the stress level from uneven loading that can be tolerated. Current designs require an activation load of 1500,000 lbf. to initiate closing. The effect of a slip joint will be greatly improved if the Slip Joint is able to close when subjected to a small compressive load instread of the 150,000 lbf. currently required.
机译:粉笔场的沉降负载具有轴向压缩负荷的套管和衬垫,并导致管壁的径向载荷不均匀。最终壳体或衬里将在由不均匀的径向装载和轴向压缩载荷组合产生的应力下的塑料坍塌。放置在压实区域中的套管滑动接头可以降低CORSS部分中的组合应力,从而增加了可以容忍的不均匀负载的应力水平。目前的设计需要150万LBF的激活负载。启动关闭。如果滑动接头能够在经过150,000LBF的小型压缩载荷仪器时,滑动接头能够接近,则滑动接头的效果将大大提高。目前需要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号