首页> 外文会议>SPE/EPA exploration and production environmental conference >Measurement of Solute Transport from an Earthen Reserve Pit During Drilling and Post Closure Operational Phases: Part I. Site Characteristics and Experiemtnal Design
【24h】

Measurement of Solute Transport from an Earthen Reserve Pit During Drilling and Post Closure Operational Phases: Part I. Site Characteristics and Experiemtnal Design

机译:在钻井和后闭合操作阶段的土坯储备坑溶质运输的测量:第一部分。现场特征和体验设计

获取原文
获取外文期刊封面目录资料

摘要

This paper reports the construction and experimental design of the first known instrumented earthen reserve pit. The instrumentation allowed the measurement of solute transport from a field reserve pitdurign drilling operations and after pit closure. The field study, conducted in Brazos County Texas, shows the limitations and advantages of the various instrumentation techniques utilized. Accordingly, other investigators can avoid use of inappropriate or unnecessary monitoring devices. Additionally, limited field data are discussed. The field study, which is the basis for this paepr, consists of 3 parts: Site Characteirstics and Experiemtnal Design, Field Measurement, and Laboratory Analyses and Interpretation. This paper presents the Site characteristics and Experiemtnal design for the reserve pit. No other field study attempts to capture solute migrating from a reserve pit, measure the chemical constituents and explain the mechanism impeding or excluding contaminatn migration. The authors rely on lysimeters, soil moisture cups, monitoring wells, and electrical resistance sensors in obtaining the field data. The lysimeters and soil moisture cups function well. However, the moisture cups provide more useable data. The resistance sensors provided no useable data. parameter analyses for soil cores taken in the pit area at pre-drilling and post-closure operational phases correlated well with soil water monitoring device data, substantiating the observations of insignificant solution migration. Further, the data are confirmed by analyzing monitoring well data over a period of more than 2 years.
机译:本文报告了第一张已知仪器储备坑的建设和实验设计。仪器允许从田间储备Pitdurign钻井操作和坑闭合后测量溶质运输。在德克萨斯州布拉索斯县进行的田间研究表明了所使用的各种仪器技术的局限性和优点。因此,其他调查人员可以避免使用不适当或不必要的监控设备。另外,讨论了有限的现场数据。该实地研究,这是该PAEPR的基础,包括3部分:现场Characteirstics和体验设计,现场测量和实验室分析和解释。本文介绍了储备坑的场地特征和体验设计。没有其他实地研究试图捕获从储备坑迁移的溶质,测量化学成分并解释阻碍或不包括污染物迁移的机制。作者依赖于获得现场数据的液晶计,土壤水分杯,监测孔和电阻传感器。溶血度计和土壤水分杯功能良好。然而,水分杯提供更具可用数据。电阻传感器不提供可用的数据。在预钻孔和后闭合操作阶段,坑面积拍摄的土壤芯的参数分析与土壤水监测装置数据良好,实质上是对微不足道的液体迁移的观察。此外,通过分析在超过2年的时间内的监测井数据来确认数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号