首页> 外文会议>International conference of hydropower >Arch bridge for crossing choshui river to divert flow into sun-moon lake for power generation
【24h】

Arch bridge for crossing choshui river to divert flow into sun-moon lake for power generation

机译:横渡赤水河的拱桥将流量转移到太阳月湖供发电

获取原文

摘要

Hydropower plant complex around the Sun-Moon Lake comprises two pumped-storage and three conventional hydropower plants, and one long diversion tunnel to divert water into the Sun-Moon Lake. The total installed capacity of the complex is 2766.4MW and depends solely on the water stored in Sun-Moon Lake for power generation. The water stored in the Sun-Moon Lake is diverted from Choshui River at the Wuchieh Dam via the existing diversion tunnel which was constructed some sixty years ago. The existing tunnel has been found to have serious and irreparable cracks on originally lined concrete. After an elaborated study, it has been found technically feasible and economically desirable to construct a new horse-shoe type tunnel with diameter of 5.05m and length of about 15km to replace the existing one. At the same time, the new tunnel can also be utilized for future development of upstream power plant. The tunnel is designed to be of gravity type with a longitudinal slope of 1/1500.
机译:Sun-Moon Lake周围的水电站综合体包括两个泵送储存和三个传统的水电站,以及一个长的转移隧道,将水转移到太阳月湖中。复杂的总装机容量为2766.4mw,仅取决于储存在阳光湖中的水供发电。储存在孙月湖中的水通过现有的转移隧道从武器大坝的Choshui河转移到了大约六十年前。已发现现有的隧道在最初衬里的混凝土上具有严重和无法铠装的裂缝。在详细研究之后,已经发现技术上可行和经济地希望构建直径为5.05米和长约15km的新型马蹄形隧道以取代现有的隧道。与此同时,新隧道也可用于上游电厂的未来发展。隧道设计成具有1/1500的纵向斜率的重力型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号