首页> 外文会议>International conference of hydropower >Summary on optimizing design of the lianhua hydropower station
【24h】

Summary on optimizing design of the lianhua hydropower station

机译:连通水电站优化设计综述

获取原文

摘要

In technical and construction design phase of the LIANHUA HYDROPOWER STATION, a great deal of the optimizing design was carried out, through the demonstration on investigation, design and testing, after revising primary design. Major measures were: took foundation excavation materials for seepage controlling materials of the core of the second dam; grouting gallery of dam foundation of the second dam was canceled; chute size of spillway was lessened; concrete lining was used instead of steel lining in the draft tube; optimizing the layout of the power tunnel intake; diversion tunnel was used shotcrete and anchor supports instead of reinforcement concrete lining; simple cylinder surge tank was turned into reluctance double circle arc type to be initiate firstly in China; optimizing design of high voltage system in the power station electricity use. The optimizing design of the Lianhua Hydropower Station has a good advantage in saving investment and speeding up construction, and has advanced to generate for two years.
机译:在莲花水电站的技术和施工设计阶段,通过在修改主要设计后,通过演示进行了大量优化设计,通过了调查,设计和测试。主要措施是:采取了基础挖掘材料,用于渗透控制第二大坝的核心;第二大坝的大坝基金会灌浆画廊被取消;减少溢洪道的斜槽尺寸;使用混凝土衬里代替牵引管中的钢衬;优化电源隧道摄入的布局;使用喷枪和锚固件代替加强混凝土衬砌的转移隧道;简单的圆筒喘振罐变成了柔和的双圆圈弧形,首先在中国启动;高压系统在电站电力使用中的优化设计。莲花水电站的优化设计在节省投资和加速建设方面具有良好优势,并先进了两年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号