首页> 外文会议>Joint Power Generation Conference >STATUS AND DEMONSTRATION OF THE BW DRB-4Z BURNER DEVELOPED FOR BW's ADVANCED COAL-FIRED LOW-EMISSION BOILER SYSTEM
【24h】

STATUS AND DEMONSTRATION OF THE BW DRB-4Z BURNER DEVELOPED FOR BW's ADVANCED COAL-FIRED LOW-EMISSION BOILER SYSTEM

机译:B&W DRB-4Z燃烧器为B&W先进的燃煤低排放锅炉系统开发的现状和示范

获取原文

摘要

Since 1992, Babcock & Wilcox has been under contract to the U.S. Department of Energy's (DOE) Federal Energy Technology Center (FETC) in Pittsburgh to develop a Low-Emission Boiler System (LEBS) under their Combustion 2000 program. The objective of the LEBS program is to develop an advanced generating plant design, ready for commercial deployment in the year 2000, which achieves extremely low emissions and high efficiency at a cost of electricity (COE) at or below the COE of a commercial PC plant meeting New Source Performance Standards (NSPS). B&W has coupled advanced environmental control technologies, capable of achieving emissions of SO{sub}x, NO{sub}x and particulate far below current NSPS, with an advanced boiler, equipped with improved combustion and heat transfer subsystems to meet these challenging goals. Phases I through III have now been completed and B&W is anticipating demonstration of these technologies in Phase IV. Phase I, completed in 1994, considered a variety of potential advanced technologies and techniques for the control of emissions, and boiler design options to select the combination that would meet the performance goals with the greatest potential for low cost. During Phase II detailed system designs were developed and validated through subsystem testing which resolved nearly all uncertainties and provided the basis for a Commercial Generating Unit (CGU) design. In Phase III the design and cost estimate for 1) a Proof-of-Concept test facility and 2) the Commercial Generating Unit were developed and evaluated against the program goals. While further development, particularly focused on integration of the subsystems, is needed during Phase IV, efforts are underway to begin commercial deployment of key components and subsystems as retrofit technologies. One of the components successfully developed during the Combustion 2000 program which has promising retrofit potential is B&W's new ultra low-N{sub}x DRB-4Z burner. This paper describes the unique development approach which led to the design of B&W's new ultra low-NO{sub}x DRB-4Z burner including its performance during subsystem testing at B&W's Clean Environment Development Facility (CEDF) located at the Alliance Research Center. A description of B&W's plans for demonstration of the DRB-4Z burner in Phase IV and at a utility site will also be described.
机译:自1992年以来,巴威已经根据合同匹兹堡能源部(DOE)的联邦能源技术中心(FETC)美国能源部规定的燃烧2000程序开发低排放锅炉系统(LEBS)。该LEBS计划的目标是在或商用PC厂COE下面建立一个先进的发电厂的设计,准备在2000年商业部署,这在电(COE)的成本实现非常低排放和高效率结识新源性能标准(NSPS)。 B&W还耦合先进的环境控制技术,能够实现SO {子} x的排放量,NO {子} x和微粒远低于当前NSPS,用先进的锅炉,配备有改进的燃烧和传热子系统,以满足这些挑战性的目标。阶段Ⅰ〜Ⅲ现已完成和B&W的预期在第四阶段,这些技术的演示。第一阶段,在1994年完成,被认为是潜在的各种先进技术和排放控制技术和锅炉设计方案的选择,将满足对低成本潜力最大的绩效目标相结合。在第二阶段的详细系统设计,开发,并通过该解决几乎所有的不确定性和用于商业用途发电机组(CGU)的设计提供了基础子系统测试验证。在第三阶段的设计和成本估计1)证明了概念测试设施和2)商业机组进行了开发和反对该计划的目标进行评估。同时进一步发展,特别是集中在子系统集成,IV阶段中是必要的,正在努力开始关键部件和子系统的改造技术的商业部署。一个燃烧2000计划,具有广阔的潜在改造过程中成功开发的组件是B&W的新型超低N {}子X DRB-4Z刻录机。本文介绍了独特的发展的做法,导致了B&W的新型超低NO {副}×DRB-4Z刻录机,包括在位于联盟研究中心的B&W的清洁环境发展基金(CEDF)子系统测试中其性能的设计。的B&W公司计划在第四阶段,在实用的网站上的DRB-4Z刻录机的演示说明也将被描述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号