Overall technological development and reform in the coal injection system have begun to be done since 1989. An-steel has achieved industrial experiments on bituminous coal injection and production. Industrial experiments on ironmaking with oxygen-coal were made successfully in two blast furnaces. The coal injection rate of 203kg/THM. Fe was obtained lasting for three months in No.3 blast furnace, the oxygen-enrichment is 3.42
展开▼