High rates of pulverised coal injection at hoogovens

机译:Hooogovens的粉煤喷射的高速率

获取原文

摘要

The ironmaking facilities at Hoogovens consist of two coke plants, a sinter plant, a pellet plant and a PCi installation to provide the ingredients necessary for producing hot metal. The PCI plant is of the Armco/Babcock & Wilcox type, which came into operation in 1983. The system was initially disigned to inject a miximum of 100 kg/THM into Blast Furnace No. 6&7, but extensive modifications to the system over the years and the addition of a third grinding facility in 1995 means that, currently, a continuous PCi rae of 220 kg/TGM is maintained at both Furnaces. The rate of coal injection currently exceeds 1.2 million tons per year, and more than seven million tons of coal have been injected to date.
机译:Hoogogens的炼铁设施包括两个焦炭植物,烧结厂,颗粒厂和PCI装置,以提供生产热金属所需的成分。 PCI工厂是Armco / Babcock&Wilcox类型,该型在1983年开始运作。该系统最初是为了将100kg / thm注入到高炉号6和7中,但多年来对系统进行了广泛的修改。并在1995年添加第三磨削设施意味着,目前,在两个炉子上保持220kg / tgm的连续PCI RAE。煤液注射率目前每年超过120万吨,并注明了超过七百万吨煤。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号