【24h】

Refurbishment of tube trains

机译:翻新管火车

获取原文

摘要

Bombardier Prorail are now well into the refurbishment of London Underground's Piccadilly fleet of Trains. This refurbishment is part of the ongoing upgrade of London Underground System and is the most extensive to date. This paper summarises the background to the refurbishment programme, the selection process of the original contractor, the work content and the solution developed. A key feature of this work programme has been the partnership between Piccadilly Line Project Team and Bombardier since the transfer of the work from RFS Doncaster to Bombardier during 1994.
机译:Bombardier Prorail现在正在进入伦敦地下的皮卡迪利舰队的翻新。这种翻新是伦敦地下系统正在进行的升级的一部分,是迄今为止最广泛的升级。本文总结了翻新计划的背景,原始承包商的选择过程,工作内容和解决方案。自1994年期间从RFS Dodcaster的工作转移到Bombardier自从从RFS Dodcaster转移到Bombardier以来,这项工作计划的一个关键特征是Piccadilly Line项目团队和庞巴迪之间的伙伴关系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号