首页> 外文会议>International Symposium Challenges in Process Intensification >Upgrading Falconbridge's No.2 furnace crucible
【24h】

Upgrading Falconbridge's No.2 furnace crucible

机译:升级Falconbridge's No.2炉坩埚

获取原文

摘要

The Falconbridge nickel smelter operated two 9by 30 m electric furnaces from 1978 to 1994 without a majorrebuild. In July 1994, No.2 Furnace was upgraded and rebrickedto accommodate double the previous calcine treatment rate.No.1 Furnace was subsequently shut down. Rebricking includedreplacement of all side wall and end wall brick, with the roofand hearth remaining in place. Details of refractory coolingdesign are presented in this paper. Milestones of the rebuildschedule are outlined, including cool-down, excavation,evaluation of the hearth, and the reheat schedule. Results duringthe first year of operation at higher capacity are discussed.
机译:Falconbridge镍冶炼厂从1978年到1994年运行了两个9By 30 M电炉,没有MajorraBuild。 1994年7月,2号炉子升级并重新串到适应前一钙处理率的双倍.1.1炉随后关闭。恢复包装的所有侧壁和末端墙砖的敷料,靠近屋顶壁炉。本文提出了耐火冷凝器的细节。概述了重建的里程碑,包括冷却,挖掘,壁炉的评估以及再热进度。讨论了在较高容量下运行期间的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号