首页> 外文会议>ASME Pressure Vessels and Piping Conference >LICENSE RENEWAL DEMONSTRATION PROJECT
【24h】

LICENSE RENEWAL DEMONSTRATION PROJECT

机译:许可续订演示项目

获取原文

摘要

Generic Aging Lessons Learned (GALL) report, License Renewal Standard Review Plan (SRP-LR), and regulatory guide were issued by the United States Nuclear Regulatory Commission (NRC) in June 2001. The intent of these documents was to provide the technical and process basis that will lead to a more effective, efficient and predictable license renewal process for industry and the NRC. The GALL report provides the aging effects on components and structures, identifies the relevant existing plant programs, and evaluates the program attributes to manage aging effects for License Renewal. The GALL report also identifies when existing plant programs would require further evaluation for License Renewal. The SRP-LR allows the applicant to reference the GALL report to demonstrate that the programs at the applicant's facility correspond to those reviewed and approved in the GALL report. Programs that correspond to those in the GALL report will not need further detailed review by the staff. Implementation of the aging management program are verified as part of the license renewal inspection program. The GALL report identifies one acceptable way of demonstrating that components and structures have adequate aging management programs. However, applicants may propose alternatives to the programs identified in GALL. During the license renewal review, the NRC primarily focuses on areas where existing programs should be augmented or new programs developed for License Renewal. This paper will provide an overview of these documents and some of the lessons learned during a demonstration project in the application of the new guidance. This topic will be of interest to the U.S. participants considering License Renewal and desiring to know state-of-the-art information about License Renewal in the United States.
机译:2001年6月,美国核监管委员会(NRC)发布了通用老化经验教训(Gall)报告,许可续签标准审查计划(SRP-LR)和监管指南。这些文件的意图是提供技术和流程基础使得为行业和NRC提供更有效,有效和可预测的许可更新进程。 Gall Report提供了对组件和结构的老化影响,确定了相关的现有工厂计划,并评估程序属性以管理许可证续订的老化效果。 Zall报告还确定现有工厂计划需要进一步评估许可续订。 SRP-LR允许申请人参考掌上报告,以证明申请人的设施的计划对应于掌上报告中审查和批准的计划。对应于Gall Report的程序,员工不需要进一步详细审查。衰老管理计划的实施被验证为许可续订检查计划的一部分。 Gall Report识别一种可接受的方式,证明组件和结构具有足够的老化管理计划。但是,申请人可以提出胆量中鉴定的方案的替代方案。在许可续期审查期间,NRC主要关注应向现有计划的区域或为许可续签制定的新计划。本文将概述这些文件以及在应用新指南中的示范项目中学到的一些经验教训。这一主题将对美国参与者考虑许可续约和希望了解有关美国许可续约的最先进信息的申请感兴趣。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号