首页> 外文会议>International Conference on Intelligent Systems Applications to Power Systems >An expert system based aid for clearing overloads on power system plant
【24h】

An expert system based aid for clearing overloads on power system plant

机译:基于专家系统的辅助电力系统工厂的清除超负荷

获取原文

摘要

This paper describes an expert system application for clearing emergency overloads on power systems. A method employing the network sensitivity factors is used to determine appropriate control actions and amount of corrections required to clear overloads. The expert system was developed on the basis of the commercial package VP EXPERT. VP EXPERT provides interactions with a power flow analysis package, PSSE, to calculate network sensitivity factors and line flows, and other external programs and a database. The governing rules for clearing overloads are introduced and the proposed approach is implemented on the IEEE 30-bus system.
机译:本文介绍了一个专家系统应用,用于清除电力系统上的紧急超载。采用网络灵敏度因子的方法用于确定清除过载所需的适当控制动作和校正量。专家系统是在商业包VP专家的基础上制定的。 VP专家提供与电源流分析包,PSSE的交互,以计算网络灵敏度因子和线路流以及其他外部程序和数据库。介绍了清算过载的管理规则,并在IEEE 30-Bus系统上实施了所提出的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号