首页> 外文会议>Conference of the Australian Society of suger cane technologists >ESTABLISHMENT OF A CONSTRUCTED WETLAND AT VICTORIA MILL
【24h】

ESTABLISHMENT OF A CONSTRUCTED WETLAND AT VICTORIA MILL

机译:在维多利亚厂建立建造湿地

获取原文

摘要

Victoria Mill has four shallow ponds known collectively as Lake Harry, into which effluent from the activated sludge plant is passed for polishing prior to discharge. A section of about 5500 square metres of Pond 3 was separated from the rest by an earth bank. This section was planted with various wetland plant species in November 1993 to establish a pilot scale constructed wetland for the tertiary treatment of mill effluent. Some difficulty was encountered in establishing the plants, resulting in supplementary planting in June 1994. Influent and effluent water samples were collected for water quality analyses. In addition, preliminary microbial population data were collected prior to the initial planting, and regularly since, to monitor the gross changes in population as the wetland becomes established. The vegetation dynamics were also monitored during establishment. Preliminary results indicate that the wetland is successfully reducing the concentrations of various water quality parameters such as BOD, nutrient levels and total suspended solids.
机译:维多利亚厂拥有四个浅池塘,作为哈利湖,在排出前通过激活的污泥厂的流出物进行抛光。一个大约5500平方米的池塘3的部分与地球银行的其余部分分开。本节于1993年11月种植了各种湿地植物物种,以建立试验规模,为磨坊的三级处理建造湿地。建立植物时遇到了一些困难,从而在1994年6月辅助种植。收集了流水和污水水样用于水质分析。此外,在初始种植之前收集初步微生物种群数据,并定期收集,以便在湿地建立湿地时监测人口的总体变化。在建立期间也监测植被动态。初步结果表明湿地成功减少了各种水质参数等浓度,如BOD,营养水平和总悬浮固体。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号