首页> 外文会议>ASME International Mechanical Engineering Congress and Exposition >OPTIMISATION OF POWER PLANT OPERATING ON WASTE HEAT OF GAS IC ENGINE DRIVEN POWER GENERATOR
【24h】

OPTIMISATION OF POWER PLANT OPERATING ON WASTE HEAT OF GAS IC ENGINE DRIVEN POWER GENERATOR

机译:煤气IC发动机发电机废热电厂的优化

获取原文

摘要

This paper describes the results of computation analysis aimed at assessing the potential benefits of several thermodynamic cycles for the recovery of waste heat from gas IC engines. This is achieved by modelling the plant and expander processes which provides the general specification of the plant in terms of key design parameters. Simultaneously, the thermodynamic performance of each cycle is calculated in terms of flow rate, power and efficiency. Detailed component models allow a rigorous investigation of the design and performance of Organic Rankine Cycle and Wet steam Cycle systems for these applications where the energy from both the water jacket and exhaust gas can be utilised. A number of system configurations are considered including cycles with wet steam expansion and organic Rankine cycles with dry vapour expansion, and the benefits of a steam-ORC cascaded arrangement are investigated. Optimisation of the system configurations provides valuable insight into the performance and practical requirements of IC waste heat recovery systems.
机译:本文介绍了计算分析结果,旨在评估几个热力学循环的潜在益处,以便从气体IC发动机恢复废热。这是通过在关键设计参数方面建模植物和扩展器过程来实现的,该植物和扩展器过程提供了植物的一般规范。同时,在流速,功率和效率方面计算每个循环的热力学性能。具体的组件模型允许对这些应用进行有机朗肯循环和湿蒸汽循环系统的设计和性能进行严格调查,这些应用可以利用来自防水套和废气的能量。考虑了许多系统配置,包括具有湿蒸汽膨胀的循环和具有干燥蒸汽膨胀的有机朗肯循环,并研究了蒸汽兽人级联布置的益处。系统配置的优化提供了对IC废热回收系统的性能和实际要求的宝贵洞察。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号