首页> 外文会议>Joint ASME/JSME Pressure Vessels and Piping Conference >RESULTS OF THE USI A-46 SEISMIC WALKDOWN PROGRAM AT THE KEWAUNEE NUCLEAR POWER PLANT
【24h】

RESULTS OF THE USI A-46 SEISMIC WALKDOWN PROGRAM AT THE KEWAUNEE NUCLEAR POWER PLANT

机译:KEWAUNEE核电站USI A-46地震人行动程的结果

获取原文

摘要

Seismic verification walkdowns of selected mechanical and electrical equipment, cable trays, tanks and heat exchangers were performed at the Kewaunee Nuclear Power Plant in 1993 to address the U.S. Nuclear Regulatory Commission Unresolved Safety Issue (USI) A-46. This paper discusses the walkdown program at Kewaunee, including the systems and equipment evaluated during the walkdowns and a detailed discussion of the walkdown findings. Wisconsin Public Service Corporation (WPSC) operates the Kewaunee plant and is a member of the Seismic Qualification Utility Group (SQUG) which developed the Generic Implementation Procedure (GIP) to resolve USI A-46. Kewaunee is a single unit, 535 MWe pressurized water reactor (PWR) with a Westinghouse nuclear steam supply system and turbine. The plant is located on the western shore of Lake Michigan and began commercial operation in 1974.
机译:在1993年的Kewaunee核电站进行了所选机电设备,电缆托盘,罐和热交换器的地震验证步伐,以解决美国核监管委员会未解决的安全问题(USI)A-46。本文讨论了Kewaunee的行走计划,包括在人行为期间评估的系统和设备以及对行走结果的详细讨论。威斯康星州公共服务公司(WPSC)经营Kewaunee工厂,是震派资格金效用集团(SQUG)的成员,该集团制定了解决USI A-46的通用实施程序(GIP)。 Kewaune是一个单一的单位,535 MWE加压水反应堆(PWR),带有西部储存核蒸汽供应系统和涡轮机。该工厂位于密歇根湖西岸,并于1974年开始商业运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号