Modelling as a tool for system engineering on the Docklands Light Railway

机译:建模作为Docklands轻铁路系统工程的工具

获取原文

摘要

The Docklands Light Railway is now in the final stages of completing a comprehensive upgrading programme which will see its design capacity raised from an original level of 15,000 passengers per day to 24,000 passengers per hour. To cope with this increase in capacity it has been necessary to add extra track, increase the vehicle fleet site and replace the fixed block signalling system with a moving block signalling system. The result is a railway of greatly increased complexity. The prime contract, which integrates the resignalling contract with the new vehicle contract system and demonstrates agreed levels of system performance, has been awarded to a joint venture company, Brown and Root, Booz Allen Limited (BBJV). System performance is measured by an indicator called system service availability (A/sub s/). A/sub s/ is calculated by two methods; one is based on analysing significant measurable service disruptions; the other captures the net impact of all service disruptions. Both methods are applied to each day's service and the lower (worse) of the two is taken as the result. To predict likely system performance BBJV has developed a PC based reliability, availability, maintainability and dependability (RAMD) model. The model accurately simulates the operation of the railway and utilises a user defined set of subsystem reliability data to predict the likely value of A/sub s/.
机译:Docklands Light Railway现在处于完成综合升级计划的最后阶段,这将看到其设计能力从每天15,000名乘客的原始水平升高到每小时24,000名乘客。为了应对该容量的增加,有必要添加额外的轨道,增加车辆舰队站点并用移动块信令系统更换固定块信令系统。结果是一种大大复杂性的铁路。将副股份合约与新车合同制度整合并表现出商定的制度表现水平,已颁发给合资公司,棕色和根,Beboz Allen Limited(BBJV)。系统性能是通过称为系统服务可用性(A / SUB S /)的指示器来衡量。 a / sub s /由两种方法计算;一个是基于分析显着的可衡量的服务中断;另一个捕获所有服务中断的净影响。这两种方法都适用于每天的服务,并且由于结果,将较低的两种(更差)。为了预测可能的系统性能BBJV已经开发了基于PC的可靠性,可用性,可维护性和可靠性(RAMD)模型。该模型精确地模拟铁路的操作,并利用用户定义的一组子系统可靠性数据来预测/子S / S / SUS的可能值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号