首页> 外文会议>Asia-Pacific Power and Energy Engineering Conference >Upgrade of Fujian grid on-Line Stability Control System for the Transformer Operating of 500kV Ningde Substation
【24h】

Upgrade of Fujian grid on-Line Stability Control System for the Transformer Operating of 500kV Ningde Substation

机译:福建电网在线稳定控制系统升级,为500kV宁德变电站运行的变压器

获取原文

摘要

To adapt the need of stability control of Fujian grid after the transformer operating of 500kV Ningde substation, Fujian grid on-line stability control system has been upgraded. After stability computing and analyzing, the upgrading scheme has been putted forward, and the upgraded system has been implemented successfully.
机译:为了适应福建电网稳定性控制的需要,在500kV宁德变电站的变压器经过500kV宁德变电站后,福建网格在线稳定性控制系统已升级。在稳定性计算和分析之后,已向前推出升级方案,升级系统已成功实施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号