首页> 外文会议>Asia-Pacific Power and Energy Engineering Conference;APPEEC 2009 >Upgrade of Fujian Grid On-Line Stability Control System for the Transformer Operating of 500kV Ningde Substation
【24h】

Upgrade of Fujian Grid On-Line Stability Control System for the Transformer Operating of 500kV Ningde Substation

机译:500kV宁德变电站变压器运行福建电网在线稳定控制系统升级

获取原文

摘要

To adapt the need of stability control of Fujian grid after the transformer operating of 500 kV Ningde substation, Fujian grid on-line stability control system has been upgraded. After stability computing and analyzing, the upgrading scheme has been putted forward, and the upgraded system has been implemented successfully.
机译:为适应500 kV宁德变电站变压器运行后福建电网的稳定控制需求,对福建电网在线稳定控制系统进行了升级。经过稳定性计算和分析,提出了升级方案,并成功实施了升级系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号