首页> 外文会议>IFAC Conference on Manufacturing Modelling, Management, and Control >A bi-criteria flow-shop scheduling with preventive maintenance
【24h】

A bi-criteria flow-shop scheduling with preventive maintenance

机译:具有预防性维护的双标准流程图调度

获取原文

摘要

In this study, a bi-criteria flow-shop scheduling with preventive maintenance tasks is considered. The objective function of the scheduling is the minimization of the makespan and for the preventive maintenance is the minimization of the sum of the earliness and tardiness between theoretical and actual frequency for two machines. The integer programming model is presented and can be solved only small size problems. For large size problem, four meta-heuristics methods are presented. Two genetic algorithms (NSGAII and SPEAII) are implemented. 2 new versions of NSGAII (noted HY-NSGAII) and SPEAII (noted HY-SPEAII) based on Johnson algorithm are presented. To evaluate the proposed approaches several tests and metrics are proposed.
机译:在本研究中,考虑了一种具有预防性维护任务的双标准流程图调度。调度的目标函数是Mapespan的最小化,并且对于预防性维护是两个机器的理论和实际频率之间的最小化和迟到的最小化。整数编程模型呈现,并且只能解决小尺寸问题。对于大尺寸问题,提出了四种元启发式方法。实施了两个遗传算法(NSGAII和SPEAII)。介绍了基于Johnson算法的NSGaii(注意HY-NSGAII)和SPEAII(注意HY-SPEAII)的新版本。为了评估建议的方法,提出了几种测试和指标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号