首页> 外文会议>International Conference on Emerging Trends in Mechanical Engineering >A green supply chain model for time quadratic inventory dependent demand and partially backlogging with Weibull deterioration under the finite horizon
【24h】

A green supply chain model for time quadratic inventory dependent demand and partially backlogging with Weibull deterioration under the finite horizon

机译:用于时间二次库存依赖性需求的绿色供应链模型,在有限范围下与威布尔恶化部分积压

获取原文

摘要

This paper presents a detail solution of re-manufacturing of a product in a supply chain model. It is a non-traditional model considering time-dependent quadratic demand, Weibull deterioration, shortages, partial backlogging and re-manufacturing of inventory. This paper mainly focuses on remanufacturing and hence an attempt towards reducing the environmental hazard. The process of remanufacturing is completed within one cycle of replenishment. Trade credit between supplier and retailer also had been discussed. Two cases one of a centralized and the other of decentralization for a finite planning horizon in a supply chain model are discussed. An algorithm has been derived for solving a problem in both the cases. Some managerial insights are talked about on the basis of sensitivity analysis on the parameters considered.
机译:本文介绍了在供应链模型中重新制造产品的细节解。考虑到时间依赖的二次需求,威布尔恶化,短缺,部分积压和重新制造,是一种非传统模式。本文主要侧重于再制造,从而试图减少环境危害。再制造过程在一个补充的一个周期内完成。也讨论了供应商和零售商之间的贸易信贷。讨论了两种情况,其中一个集中式和另一个用于供应链模型中的有限规划地平线的权力下放。已经导出了一种算法,用于解决两种情况下的问题。关于考虑参数的敏感性分析,讨论了一些管理洞察。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号