The Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS), "the Project," was transferred to the US Army Corps of Engineers (USACE) in 1997. Shortly thereafter, USACE initiated FUSRAP remediation efforts on 24 commercial and residential properties and, in addition, the Project team evaluated properties previously addressed at the FMSS. One of those properties was located at 96 Park Way in Rochelle Park, New Jersey. The property history included removal of contaminated soil in 1985 by the US Department of Energy (USDOE). Soil sampling performed after removal of contaminated soil indicated the cleanup met applicable guidelines in place at the time. A Five-Year Review of the FMSS conducted by the US Environmental Protection Agency (USEPA) in 2009 found that 96 Park Way did not meet the current residential cleanup levels for the site and recommended additional study and remediation, if warranted. The current levels are established in the approved cleanup plan for the FMSS (known as the Record of Decision [ROD]) issued in 2003. Based on USEPA's recommendation, USACE carefully reviewed all available records for the property. The review considered the differences between the soil cleanup standards used in the 1980s and the 2003 ROD standards, which are slightly more restrictive for deeper soils. The USACE conducted detailed field studies at 96 Park Way in 2014-15 to address the USEPA findings. This work included gamma walkover surveys and soil sampling to depths of approximately 3.5 meters. The results identified three discrete areas at depth that did not meet the ROD residential soil cleanup standard: two areas bordering an adjacent highway (New Jersey Route 17) and one along railroad property adjacent to the site. To address these areas, soil removal actions were conducted in 2016-17. The principal challenge with construction, engineering, and community relations was the property housed two sensitive facilities: a long-term assisted care living facility and a short-term post-surgery rehabilitation center. The operations at these facilities could not be interrupted in any way during FUSRAP activities. The three FUSRAP-impacted areas were addressed and restored in coordination with the USEPA, property management, and local officials. Site restoration presented a particular challenge well after the remedial action was completed, as the property owner and the government disagreed on the level of restoration. Those negotiations are ongoing as of this writing.
机译:原用的网站补救行动计划(FUSRAP)Maywood Superfund网站(FMSS),“项目”于1997年转移到美国陆军兵团(USACE)。此后不久,USACE启动了24家商业和住宅的Fusrap修复努力属性,此外,项目团队评估了先前在FMSS上寻址的属性。其中一个物业位于新泽西州Rochelle Park的96位Park Way。物业历史包括美国能源部(USDOE)1985年污染土壤去除。去除污染土壤后进行的土壤采样表明,清理当时达到适用的指导方针。 2009年美国环境保护局(USEPA)对FMSS进行了为期五年的审查,发现96个Park Way没有符合目前本网站的住宅清理水平,并推荐额外的研究和补救,如果有保证。目前的水平是在2003年发布的批准的FMSS(称为[ROD]的记录)的批准的清理计划中建立的。基于USEPA的建议,USACE仔细审查了物业的所有可用记录。该评价考虑了20世纪80年代和2003年杆标准的土壤清洁标准之间的差异,对更深的土壤有略微限制。 USACE于2014 - 15年在2014年至15日在96个公园方式进行了详细的实地研究,以解决常见的结果。这项工作包括伽玛步行调查和土壤采样,深度约3.5米。该结果确定了3个深度的离散区域,不符合杆住宅土壤清洁标准:两位接壤的邻近公路(新泽西州17号航线17)和沿着网站附近的铁路物产。为了解决这些领域,在2016 - 17年进行了土壤清除行动。建筑,工程和社区关系的主要挑战是该物业拥有两个敏感设施:长期辅助护理生活设施和短期手术后康复中心。在Fusrap活动期间,这些设施的操作无法以任何方式中断。在与USEPA,物业管理和当地官员协调的协调中解决并恢复了三个诡计影响的区域。在完成补救行动完成后,现场恢复呈现出特别的挑战,因为物业所有者和政府不同意恢复水平。那些谈判正在追求这份撰写。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号