Exploration gas reservoir wells demand detailed operational planning to be drilled. In the same way different issues should be overcome as a consequence of the challenges faced during this kind of operation. Yacimientos Petroliferos Fiscales S.A. (YPF S.A.) has planned to drill an exploratory gas well in Los Perales area, in Santa Cruz State southern part of Argentina. This vertical well was initially designed to a planned True Depth (TD) of 14,760 ft., in a 358掳F reservoir temperature with a 10.0 lb/gal Water Based Mud (WBM) Mud Weight. Actual TD was 15,203 ft., reservoir temperature reached 365掳F and a 17.2 lb/gal WBM was required to balance pore pressure. Provincial regulations did not permit to drill with Oil Based Mud (OBM) in this area, so it was required to apply a WBM in this well. The main challenge for this Project was to formulate the High Pressure High Temperature (HPHT) drilling fluid, to drill the potential reservoir section, as well as keeping the fluid stability at all times, specially related to fluid's rheological properties, filtration parameters and mud weight control, likewise to avoid that contaminants destabilizes the mud. This paper will describe the methodology applied to develop and to design the fluid to drill the 6 inches reservoir section for this well. It will be highlighted the lab tests results to obtain the fluid basic formulation, as well as to simulate fluid behavior under some bottom hole conditions. Finally the results will be discussed with emphasis on the main preventive drilling fluids engineering actions taken to optimize the operational performance. The aspects related to both drilling fluids formulation and engineering application will be detailed. Planning was vital to achieve the successful application of WBM in the face of such operational conditions as drilling under a high pressures and high temperatures scenario. When drilling the 6 inches reservoir hole section, no sedimentation of Barite was observed, the rheological properties and the HPHT filtration were kept stable. It should be noted that three wireline log runs were performed, maintaining adequate well stability, showing nominal and homogeneous caliper, and very good quality of electrical loggings data acquisition. The 5 inches production casing was successfully ran and cemented to planned depth.
机译:勘探燃气储层井要求钻探详细的操作计划。以同样的方式,由于这种运作期间面临的挑战,应克服不同的问题。 Yacimientos Petroliferos Fiscales S.A.(YPF S.A.)计划在Santa Cruz州南部的阿根廷南部的洛杉矶普罗尔地区钻探探索性气体。该垂直井最初设计成规定的真实深度(Td)为14,760英尺,在358÷f储层温度下,具有10.0磅/加仑水基泥浆(WBM)泥浆重量。实际TD为15,203英尺。,储层温度达到365°F,需要17.2磅/加仑WBM来平衡孔隙压力。省级法规不允许在该地区钻取油基泥(OBM),因此需要在这井中申请WBM。该项目的主要挑战是制定高压高温(HPHT)钻孔流体,钻取潜在的储层部分,以及保持流体稳定性,与流体的流变性质,过滤参数和泥浆重量有关同样控制,避免污染物破坏泥浆。本文将描述应用于开发和设计流体的方法,以便在此井钻6英寸储存器部分。它将被突出显示实验室测试结果以获得流体碱性配方,以及在一些底部孔条件下模拟流体行为。最后,结果将重点讨论主要预防钻井流体,以优化操作性能。将详细介绍与钻井液配方和工程应用有关的方面。规划对于在面对这种操作条件下实现WBM的成功应用至关重要,因为在高压和高温场景下钻探。在钻出6英寸储层孔部分时,未观察到重晶石的沉降,使流变性能和HPHT过滤保持稳定。应该指出,三类电缆测井运行中进行,保持足够的稳定性好,表现出标称均匀厚度,和电测井公司数据采集的质量非常好。 5英寸的生产套管成功耗尽并粘合到计划深度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号