【24h】

Business Model Canvas Synthesis Process from DEMO Construction Model

机译:演示施工模型的商业模式帆布综合进程

获取原文

摘要

The notion of a system can be represented in two ways, as a function or as a construction. A transformation can occur between them. Function can be represented by Business Model Canvas (BMC) and construction can be represented by DEMO Construction Model (DEMO CM). To find a new BMC, we can apply these phases; transform existing BMC into DEMO CM, manipulate it into a new CM, and transform it back into new BMC to create a new business. The transformation from BMC to DEMO CM is already provided, however, it only explains about DEMO CM generation from BMC. The manipulation of DEMO CM is also already proposed. This paper proposed the final phase of the process; to synthesize BMC from DEMO CM. Decision Tree is used to generate BMC from DEMO CM, resulting in Pre-BMC. A case study of EU-Rent is used to illustrate the proposed methodology. We proposed Pre-BMC generation as an intermediate process of BMC synthesis, and refine it into a completed BMC.
机译:系统的概念可以用两种方式表示,作为函数或作为构造。它们之间会发生变换。功能可以由商业模式Canvas(BMC)和结构表示,可以通过演示施工模型(演示CM)表示。要查找新的BMC,我们可以应用这些阶段;将现有的BMC转换为演示CM,将其操作成一个新的CM,并将其转换为新BMC以创建新业务。已经提供了从BMC到演示CM的转换,但是,它仅解释了BMC的演示CM生成。还提出了演示CM的操纵。本文提出了该过程的最终阶段;从演示厘米合成BMC。决策树用于生成来自演示CM的BMC,导致BMC前。欧盟租金的案例研究用于说明所提出的方法。我们提出了BMC前代作为BMC合成的中间过程,并将其精炼成完成的BMC。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号