The time for completion on a construction project is of great importance and is sometimes referred to as being of the essence. Having a known completion date that the contractor shall be willing to commit to carries both advantages and implications. That is, if the contractor inexcusably overruns this completion date, he becomes liable for delay damages which usually take the form of liquidated damages (LD). During the course of construction, several circumstances may surface which have the effect of the time for completion to be said to have become at large, a situation that can hinder the triggering of the LD clause by employers. This paper aims to explain the concept of time at large and its reasons and implications, while viewing its applicability under both the common and civil law systems. It highlights the conditions whose prevalence justifies the time on the construction contract to be called to have become at large. The work represents the foundation for constructing a method that can aid in systematically testing if such a calling can be viewed as justifiable.
机译:完成建设项目的时间非常重要,有时被称为本质。有一个已知的完工日期,即承包商愿意承诺提供两种优缺点。也就是说,如果承包商不可行地超越这一完成日期,他对延迟损害赔偿的责任责任,这通常采取违约损害赔偿金(LD)。在施工过程中,几种情况可能会表面的效果效果才能达到较大,这可以阻碍雇主触发LD条款的情况。本文旨在解释大规模及其原因和影响的时间概念,同时在共同和民法制度下观察其适用性。它突出了普遍证明待拨出的建造合同时间的条件变得越来越大。该工作代表了构建一种方法,该方法可以在系统地测试中可以帮助,如果这样的呼叫可以被视为合理的方式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号